HONOLULU RAIL TRANSIT PROJECT
UPDATE
FARRINGTON
HIGHWAY LANE CLOSURE NOTICE
ROAD
PAVING AT LEOKU AND LEOKANE STREET INTERSECTIONS
Late
October or Early November 2019 – Duration of Work: 5-7 Work Days
The
Honolulu Authority for Rapid Transportation (HART) would like to update area residents
and businesses of the start of paving the Leoku Street and Leokane Street
intersection in the area. The area may experience an increase of noise and
traffic delays. For the safety of work
crews and the traveling public, please observe construction signage.
WHAT
TO EXPECT DURING CONSTRUCTION
· Intermittent
lane closures. Personnel and special-duty police officers will be onsite to
assist pedestrians and commuters as needed.
· Detours
will be in place for motorists and pedestrians.
Business and residential access may be modified. Please be aware of traffic pattern changes in
this area.
· For
safety, the speed limit will be reduced to 15mph in both directions.
· Bus
stops and routes may be modified or closed during this operation. For up-to-date bus information, call
(808)848-5555 or visit www.TheBus.org.
zone, please pardon the inconvenience.
You may experience increased traffic and noise levels. For more information, please contact HART’s
24-hour project hotline at (808)
566-2299 or via email: info@honolulutransit.org. You can also visit their website at www.HonoluluTransit.org.