HONOLULU RAIL TRANSIT PROJECT
UPDATE
FARRINGTON
HIGHWAY OVERNIGHT CLOSURES
WESTBOUND
BETWEEN LEOKANE TO LEOKU STREET
OVERNIGHTS
FROM Monday, November 18 to Saturday, November 23
9:00pm
to 5:00am
Hawaiian
Dredging Construction Company, on behalf of the Honolulu Authority for Rapid
Transportation (HART), will temporarily close all westbound lanes and the sidewalk on Farrington Highway from Leokane
Street to Leoku Street overnight, between the hours of 9pm and 5am. From Monday, November 18 to Saturday, November 23 for
canopy installation.
Business
access to the Zippy’s / Don Quijote driveway entrance
WHAT
TO EXPECT DURING CONSTRUCTION
· Intermittent
lane closures. Personnel and special-duty police officers will be onsite to
assist pedestrians and commuters as needed.
· Detours
will be in place for motorists and pedestrians. Business and residential access may be modified. Please be aware of traffic pattern changes in
this area.
· For
safety, the speed limit will be reduced to 15mph in both directions.
· Bus
stops and routes may be modified or closed during this operation. For up-to-date bus information, call
(808)848-5555 or visit www.TheBus.org.
For
those living or working close to the work zone, please pardon the
inconvenience. You may experience
increased traffic and noise levels. For
more information, please contact HART’s 24-hour project hotline at (808) 566-2299 or via email: info@honolulutransit.org. You can also visit their website at www.HonoluluTransit.org.